Table of Contents

1. Plan

This document describes about the upcoming PhD plan for the upcoming year with the reflection of the previous year.

1.2. Highoverview of the previous plan:

1.2.1. Phase 1: FAT-Pointer (Jul–Sep 2024)

  1. July 1–15 (2024)
    • Debug L1 TLB misses
    • Run COZ benchmarks
    • Port kernel module to SnMalloc
  2. July 15–30 (2024)
    • Benchmark with SPEC & XSBench
    • Compare with SnMalloc variants
  3. August (2024)
    • Draft EuroSys paper
  4. September (2024)
    • Write thesis chapter
    • Finalize EuroSys submission

1.2.2. Phase 2: RISC-V Integration (Oct 2024–May 2025)

  1. October–December (2024)
    • Modify Bluespec to bypass TLB
    • Set up evaluation environment
  2. Janurary–Feburary
    • Evaluate FAT-Pointer on RISC-V
    • Draft and refine ISMM paper
  3. March–May
    • Address backlog
    • Extend thesis chapter

1.2.3. Phase 3: Uni-Kernel (May 2025–September 2026)

  1. May–December 2025
    • Port allocator to CHERI Uni-Kernel
    • Design and evaluate unified allocator
    • Draft OSDI paper
  2. Janurary–September 2026
    • Finalize full PhD thesis

1.3. Current plan

1.3.1. June to July (2025)

  • Working on modifications to BlueSpec BSV files of the CHERI Toooba architecture.
  • Setting up baremetal C benchmark against the BlueSpec simulator.
  • Supervisory team modifications to the EuroSys paper.
  • Progression month.
  • Send the EuroSys paper to the Glasgow CHERI team for feedback.

1.3.2. July to August (2025)

  • Heavy debugging of the Toooba core for potencial expected errors (Bypass TLB phase of the memory pipeline).
  • Finalising the C benchmark suite for the Toooba architecture.
  • Documenting Toooba work to reused for the 2nd paper.
  • End of July (Work on EuroSys paper).

1.3.3. August to September (2025)

  • Heavy debugging of the Toooba core for potencial expected errors (Similar to July).
  • Finish writing for Toooba work the Abtract, Introduction and methodology of the paper.
  • Expect preliminary results of the Toooba expirment.

1.3.4. September to October (2025)

  • Publish EuroSys paper (FAT Allocator).
  • Start benchmarking Toooba work.
  • Parallel write up of the Evaluation section.

1.3.5. October to November (2025)

  • Start work on the 3rd expirement (Heavier evaluation of expirement 1 and 2).
  • Modification to replace mmap in TcMalloc and Mesh allocator

1.3.6. November to December (2025)

  • Strip away Huge page aware implementation from JeMalloc, TcMalloc and Mesh.
  • Analyse the amount intructions reduced.
  • Start writing paper 3 based on EuroSys paper.

1.3.7. December to Janurary (2025 to 2026)

  • Evaluation of paper 3.
  • Start writing thesis for Expirement 1 and 2.

1.3.8. Janurary to September (2026)

  • Backlog catch up.
  • Paper publishing for Expirement 3.
  • Thesis write up phase.